Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.016 seconds
Youngblood, R.W.; Worrell, R.B.
Brookhaven National Lab., Upton, NY (United States). Funding organisation: USDOE, Washington, DC (United States)1995
Brookhaven National Lab., Upton, NY (United States). Funding organisation: USDOE, Washington, DC (United States)1995
AbstractAbstract
[en] A key step in formulating a regulatory basis for licensing complex and potentially hazardous facilities is identification of a collection of design elements that is necessary and sufficient to achieve the desired level of protection of the public, the workers, and the environment. Here, such a collection of design elements will be called a ''prevention set.'' At the design stage, identifying a prevention set helps to determine what elements to include in the final design. Separately, a prevention-set argument could be used to limit the scope of regulatory oversight to a subset of design elements. This step can be taken during initial review of a design, or later as part of an effort to justify relief from regulatory requirements that are burdensome but provide little risk reduction. This paper presents a systematic approach to the problem of optimally choosing a prevention set
Primary Subject
Secondary Subject
Source
1995; 8 p; Joint ASME/JSME pressure vessels and piping conference; Honolulu, HI (United States); 23-27 Jul 1995; CONF-950740--29; CONTRACT AC02-76CH00016; Also available from OSTI as DE95010450; NTIS; US Govt. Printing Office Dep
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue