[en] This final report provides a general description of the activities performed to dismantle and interim stabilize the 107-C, 107-KE, and 107-KW retention basins. These activities were performed as part of the Radiation Area Remedial Action Project. Dismantlement and interim stabilization were required to minimize wind and biotic transport vectors at these sites until final remediation occurs