Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
AbstractAbstract
[en] This report documents the deactivation of the ion exchanger vault at the 309 Plutonium Recycle Test Reactor (PRTR) Facility in the 300 Area. The vault deactivation began in May 1995 and was completed in June 1995. The final site restoration and shipment of the low-level waste for disposal was finished in September 1995. The ion exchanger vault deactivation project involved the removal and disposal of twelve ion exchangers and decontaminating and fixing of residual smearable contamination on the ion exchanger vault concrete surfaces
Primary Subject
Secondary Subject
Source
Mar 1996; 60 p; CONTRACT AC06-93RL12367; Also available from OSTI as DE96009902; NTIS; US Govt. Printing Office Dep
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue