Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
Qualls, A.L.; Eatherly, W.S.; Heatherly, D.W.
Fusion materials semiannual progress report for the period ending June 30, 19961996
Fusion materials semiannual progress report for the period ending June 30, 19961996
AbstractAbstract
[en] The TRIST-ERI capsule was assembled and irradiated in a large Removable Beryllium (RB star) position of the High Flux Isotope Reactor (HFIR) during this reporting period. Irradiation began on March 8, 1996, was completed on June 20, 1996, during operating cycles 344, 345, and 346. This report describes the thermal operation of the capsule
Primary Subject
Secondary Subject
Source
Oak Ridge National Lab., TN (United States); 358 p; Oct 1996; p. 267-271; Also available from OSTI as DE97000700; NTIS; US Govt. Printing Office Dep
Record Type
Report
Literature Type
Progress Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue