Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
AbstractAbstract
[en] Palo Verde Nuclear Generating Station has used PRA-derived risk insights for about 10 years now. The plant originally started applying PRA modeling to an auxiliary feedwater system during the initial licensing phases of the plant, and as a result of that, they were able to work with the NRC and apply some graded quality requirements to that particular system. There was a third redundant auxiliary feedwater pump, and they now can treat that system as partially safety related and partially non-safety related. So it was an advance for Palo Verde at that time to be able to make decisions with a PRA and they began learning how to use those techniques. After completing the IPE it became natural for the plant to make a transition into other areas at the plant to look for areas where the insights gained from PRA could be applied into their decision-making processes. Those that the plant embarked upon initially were areas where they could gain operational risk assessment insights. The author goes on to discuss experiences gained in using these techniques to better assess the safety of operations within the plant. In addition he offers comments on areas which need further development and research to make them more applicable to a plant by plant basis
Primary Subject
Secondary Subject
Source
Monteleone, S. (comp.) (Brookhaven National Lab., Upton, NY (United States)); Nuclear Regulatory Commission, Washington, DC (United States). Office of Nuclear Regulatory Research; Brookhaven National Lab., Upton, NY (United States); 372 p; Jan 1997; p. 7-19; 24. water reactor safety information meeting; Bethesda, MD (United States); 21-23 Oct 1996; Also available from OSTI as TI96014720; NTIS; GPO
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue