Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.015 seconds
AbstractAbstract
[en] A broad overview of the leak before break (LBB) application to the Slovakian V-1 nuclear power plant is presented in the paper. LBB was applied to the primary cooling circuit and surge lines of both WWER 440 type units, and also used to assess the integrity of safety related piping in the feed water and main steam systems. Experiments and calculations performed included analyses of stresses, material mechanical properties, corrosion, fatigue damage, stability of heavy component supports, water hammer, and leak rates. A list of analysis results and recommendations are included in the paper
Primary Subject
Source
Faidy, C. (ed.) (Electricite de France, Villeurbanne (France)); Gilles, P. (ed.) (Framatome, Paris (France)); Nuclear Regulatory Commission, Washington, DC (United States). Div. of Engineering Technology; Electricite de France (EDF), 69 - Villeurbanne (France); Battelle, Columbus, OH (United States); 773 p; Apr 1997; p. 533-540; Seminar on leak before break in reactor piping and vessels; Lyon (France); 9-11 Oct 1995; Also available from OSTI as TI97004806; NTIS; GPO
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue