Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
Lamare, J de; Donaldson, A.; Kulikov, A. Lipari, J.
Stanford Linear Accelerator Center, Menlo Park, CA (United States). Funding organisation: USDOE Office of Energy Research, Washington, DC (United States)1997
Stanford Linear Accelerator Center, Menlo Park, CA (United States). Funding organisation: USDOE Office of Energy Research, Washington, DC (United States)1997
AbstractAbstract
[en] The PEP-II project has two storage rings. The HER (High Energy Ring) has up to 1.48 A of electron beam at 9 GeV, and the LER (Low Energy Ring) has up to 2.14 A of positron beam at 3.1 GeV. To protect the HER and LER beam lines in the event of a ring component failure, each ring has an abort kicker system which directs the beam into a dump when a failure is detected. Due to the high current of the beams, the beam kick is tapered from 100% to 80% in 7.33 uS (the beam transit time around the time). This taper distributes the energy evenly across the window which separates the ring from the beam dump such that the window is not damaged. The abort kicker trigger is synchronized with the ion clearing gap of the beam allowing for the kicker field to rise from 0-80% in 370 nS. This report discusses the design of the system controls, interlocks, power supplies, and modulator
Primary Subject
Secondary Subject
Source
Jul 1997; 4 p; 17. IEEE particle accelerator conference; Vancouver (Canada); 12-16 May 1997; CONF-970503--189; CONTRACT AC03-76SF00515; Also available from OSTI as DE97007960; NTIS; US Govt. Printing Office Dep
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue