Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.012 seconds
AbstractAbstract
[en] The objectives of Task 5 were to review: (1) the extent of dredging, construction, and other sediment-disturbing activities conducted by the Tennessee Valley Authority (TVA) in potentially contaminated areas of Watts Bar Reservoir; and (2) the disposition of the materials from these activities. This memorandum is the final report for Task 5. This memorandum describes major activities in the Watts Bar Reservoir and Melton Hill Reservoir areas of the Clinch River that possibly resulted in significant disturbance of potentially contaminated sediments. TVA records from the construction of Watts Bar Dam, Kingston Fossil Plant, and Melton Hill Dam were reviewed to facilitate qualitative description of the effect of these activities in disturbing potentially contaminated sediments. The critical period for these activities in disturbing contaminated sediments was during or after 1956 when the peak releases of radioactive contaminants occurred from the Oak Ridge Reservation
Primary Subject
Source
1993; 10 p; CONTRACT AI05-91OR22007; ALSO AVAILABLE FROM OSTI AS DE98002516; NTIS; US GOVT. PRINTING OFFICE DEP
Record Type
Report
Literature Type
Numerical Data
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue