Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
Hassan, M.; Vesely, W.E.
Nuclear Regulatory Commission, Washington, DC (United States). Div. of Systems Technology; Brookhaven National Lab., Upton, NY (United States); Science Applications International Corp., Dublin, OH (United States). Funding organisation: Nuclear Regulatory Commission, Washington, DC (United States)1998
Nuclear Regulatory Commission, Washington, DC (United States). Div. of Systems Technology; Brookhaven National Lab., Upton, NY (United States); Science Applications International Corp., Dublin, OH (United States). Funding organisation: Nuclear Regulatory Commission, Washington, DC (United States)1998
AbstractAbstract
[en] In this report, we present a screening study to identify environmental stressors for digital instrumentation and control (I ampersand C) systems in a nuclear power plant (NPP) which can be potentially risk-significant, and compare the hardware unavailability of such a system with that of its existing analog counterpart. The stressors evaluated are temperature, humidity, vibration, radiation, electro-magnetic interference (EMI), and smoke. The results of risk-screening for an example plant, subject to some bounding assumptions and based on relative changes in plant risk (core damage frequency impacts of the stressors), indicate that humidity, EMI from lightning, and smoke can be potentially risk-significant. Risk from other sources of EMI could not be evaluated for a lack of data. Risk from temperature appears to be insignificant as that from the assumed levels of vibrations. A comparison of the hardware unavailability of the existing analog Safety Injection Actuation System (SIAS) in the example plant with that of an assumed digital upgrade of the system indicates that system unavailability may be more sensitive to the level of redundancy in elements of the digital system than to the environmental and operational variations involved. The findings of this study can be used to focus activities relating to the regulatory basis for digital I ampersand C upgrades in NPPs, including identification of dominant stressors, data-gathering, equipment qualification, and requirements to limit the effects of environmental stressors. 30 refs., 8 figs., 26 tabs
Primary Subject
Source
Jan 1998; 119 p; BNL-NUREG--52536; CONTRACT AC02-76CH00016; ALSO AVAILABLE FROM OSTI AS TI98002675; NTIS; GPO
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue