Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
AbstractAbstract
[en] A brief description is given of the updating carried out at the Embalse NPP after commissioning, covering the station fire equivalent loads, the station weak points from the fire point of view, the possible upgrading of systems or technological improvements, early alarm and automatic actions, organizations, education and training, and drills. (author)
Primary Subject
Source
International Atomic Energy Agency, Vienna (Austria); 402 p; ISSN 1011-4289;
; Apr 1998; p. 345-348; International symposium on upgrading the fire safety of operating nuclear power plants; Vienna (Austria); 18-21 Nov 1997; IAEA-SM--345/17

Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue