Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.015 seconds
AbstractAbstract
[en] Knolls Atomic Power Laboratory reported that the trip-initiated, problem-termination feature was not functioning in TRAC-P, Version 5.4.15. A listing of the modified input data for the DRAIN standard test problem and the TRCMSG file output was provided that demonstrated that the TRAC-P calculation did not terminate when the problem-termination designated trip's set status was set to ONforward. The assigned task was to investigate and correct this nonfunctioning feature in TRAC-P, Version 5.4.28. Update FXTPTM corrects a trip pointer error in subroutine TIMCHK that prevented the trip-initiated, problem-termination feature from functioning in TRAC-P
Primary Subject
Secondary Subject
Source
29 Aug 1997; 12 p; CONTRACT W-7405-ENG-36; ALSO AVAILABLE FROM OSTI AS DE98005304; NTIS; US GOVT. PRINTING OFFICE DEP
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue