Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
AbstractAbstract
[en] This paper presents an overview of the Engineering Compliance Program (ECP) development process and its role in design. The ECP is a formal program to assess Nuclear Regulatory Commission (NRC) regulatory guidance in terms of precedence, industry experience documents, and codes and standards to determine their applicability to Mined Geologic Disposal System (MGDS) design. These determinations are documented in ECP Guidance Packages for MGDS Structures, Systems and Components (SSCs). This ensures that the license application appropriately reflects the MGDS design and facilitates NRC acceptance and compliance review
Primary Subject
Secondary Subject
Source
Dec 1997; 10 p; CONTRACT AC08-91RW00134; ALSO AVAILABLE FROM OSTI AS DE98005819; NTIS; US GOVT. PRINTING OFFICE DEP
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue