Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.021 seconds
Zimmermann, F.; Yocky, G.; Whittum, D.H.; McCormick, D.; Horton-Smith, S.
Stanford Univ., Stanford Linear Accelerator Center, CA (United States). Funding organisation: USDOE Office of Energy Research, Washington, DC (United States)1998
Stanford Univ., Stanford Linear Accelerator Center, CA (United States). Funding organisation: USDOE Office of Energy Research, Washington, DC (United States)1998
AbstractAbstract
[en] The relative timing of electron and positron bunches at the SLC interaction point (IP) is affected by phase and energy fluctuations in various upstream systems. By shifting the collision point, IP timing variation may degrade the luminosity and hinder IP spot-size tuning. To monitor the timing stability, in 1997 a novel rf monitor was installed in the South Final Focus, which measures the relative arrival time of the two bunches on every beam pulse. The monitor is based on narrow-band filtering of the beam-induced signal from a common pickup, delay of the first beam waveform into coincidence with the second, and homodyne mixing
Primary Subject
Source
Mar 1998; 4 p; 1. Asian particle accelerator conference; Tsukuba, Ibaraki (Japan); 23-27 Mar 1998; CONF-980359--; CONTRACT AC03-76SF00515; ALSO AVAILABLE FROM OSTI AS DE98059206; NTIS; US GOVT. PRINTING OFFICE DEP
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue