Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
AbstractAbstract
[en] Feasibility study of the rehabilitation of units in TPP Kakanj has shown that the oldest units 1 and 3 (2x32MW) are not included in the plans for the future. The conclusion of the study envisage the installation of a combined-cycle instead of the existing units 1 and 3 and the conversion injection systems (from liquid to gas fuel) in all other units 2, 4 (2x32MW), 5 and 6 (2x110MW) and unit 7 (30MW). The main reason for this suggestion are: - higher efficiency - increased availability and reliability - possibility to meet peek loads with low water accumulations and unfavourable hydrological conditions - harmonization of the natural gas demand curve, which decreases the fuel price - lower natural gas price compared to that of liquid gas per measure unit - environmental pollution reduction. (author)
Original Title
Mogucnosti koristenja prirodnog plina u TE Kakanj
Primary Subject
Source
Croatian Energy Association (Croatia); 291 p; ISBN 953-96345-5-5;
; 1998; p. 277-282; 7. forum: Croatian Energy Day: Future Facing the Energy Sector Following Kyoto Conference; Sedmi forum: Dan energije u Hrvatskoj: Buducnost energije nakon Kyota; Zagreb (Croatia); 11 Dec 1998; 1 tab., 3 figs.

Record Type
Miscellaneous
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue