Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.019 seconds
AbstractAbstract
[en] The Advanced Photon Source (APS) is a 7-GeV, third-generation synchrotron radiation source. To provide a more stable beam for users, in September 1998 the authors began commissioning a new operating mode called top-up. In this mode, the beam current does not decay but is maintained at a high level using frequent injection, while photon shutters are open and photon beams are delivered to users. The exhaustive analysis for top-up safety will be reviewed as well as the hardware and software required for top-up operation. Operational experience so far includes testing aspects of top-up injection, delivering beam to X-ray users for a few hours with fractional current stability of 0.001, and routinely providing beam to users by refilling the ring to 100 mA every 12 hours with shutters open. Top-up performance issues encountered are short-lived orbit and emittance transients during the injection event, which appear in user experiments as X-ray beam brightness dips. Planned system modifications to reduce these beam transients are described. The main operational issue left for continuous top-up injection will then be sharing the injector system with other operations
Primary Subject
Source
26 Oct 1999; 9 p; 11. U.S. National Synchrotron Radiation Instrumentation Conference; Stanford, CA (United States); 13-15 Oct 1999; W-31109-ENG-38; Also available from OSTI as DE00750547; PURL: https://www.osti.gov/servlets/purl/750547-PEHWLW/webviewable/
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue