Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
AbstractAbstract
[en] Three decades of operating experience in India has led to sustained high performance of NPP's. The staffing modules and policies are standardised. The basic functions of operation, maintenance, technical support and quality assurance are carried out by a team of 727 in-plant persons (for a 2 x 220 MW PHWR station) organised at five levels, for fifty positions in ten job families. The organisational factors that led to optimising of staff are described in the companion paper. This optimisation of manpower is a result of continuous learning - for (i) optimising quantum of workload and (ii) improving productivity. For the first category, design improvements over older Indian NPP's have increased reliability, operability, maintainability and human factors. Few examples: (i) improved man-machine interface in plant controls and on-power refuelling system with operator guidance, logging as well as diagnostic/health monitoring features; (ii) spread out layout for better access and ease of maintenance, separation of plant services for unit-1 from unit-2 and, removal of reactor auxiliaries out to separate buildings; (iii) reduction of maintenance tasks through redesigned equipment and improved condition monitoring means. However, design and procedural improvements also include additional equipment for upgradation of safety measures, e.g. larger number of safety related pumps separate switchyard control room and increased service system equipment. This paper outlines experience of design improvements in optimising staffing and uses a specific case illustration to establish the findings for better use of staff. (author)
Primary Subject
Source
International Atomic Energy Agency, Vienna (Austria); 129 p; ISSN 1011-4289;
; Jan 2001; p. 59-66

Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue