Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
AbstractAbstract
[en] At the end of this year, the Basic Design Optimisation Phase will come to an end. All the necessary documents needed to conclude the assessment of the concept by the French and German Safety Authorities will be released by the project. The next step to be decided is now the entering into the detailed design, which will be done after the construction of the first of a kind unit is decided in France. This is a major political decision, which cannot be achieved before the middle of next year. The status of the project at the end of the Basic Design Optimisation Phase is summarized in this paper. (author)
Primary Subject
Source
European Nuclear Society, Berne (Switzerland); 242 p; ISBN 3-9520691-3-2;
; 1998; p. 177-181; ENC 98 World Nuclear Congress; Nice (France); 25-28 Oct 1998; 1 fig., 1 tab.

Record Type
Book
Literature Type
Conference
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue