Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
Kurihara, Akira; Oyamada, Masayuki; Hama, Hiroyuki; Hinode, Fujio; Shinto, Katsuhiro; Takahashi, Shigenobu; Shibasaki, Yohsinobu
Proceedings of the 25th linear accelerator meeting in Japan2000
Proceedings of the 25th linear accelerator meeting in Japan2000
AbstractAbstract
[en] The TOHOKU linac has been operated since 1967, and the integrated operation time reaches 3,000 hours par year in these years. The construction of the Stretcher-Booster (STB) ring was completed in 1996 and the beam commissioning was started from October 1997. Beam supply for the nuclear experiment was started from 1998. Because the linac is getting too old, many components have to be repaired and/or replaced for further continuously stable operation. Present status and improvements for the linac during last year are reported. (author)
Primary Subject
Source
Japan Synchrotron Radiation Research Inst., Mikazuki, Hyogo (Japan); 446 p; 2000; p. 1-3; 25. linear accelerator meeting in Japan; Himeji, Hyogo (Japan); 12-14 Jul 2000; Available from Japan Synchrotron Radiation Research Institute, 1-1-1 Koto, Mikazuki-cho, Hyogo-ken 679-5198 Japan; 2 refs
Record Type
Miscellaneous
Literature Type
Conference
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue