Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.019 seconds
AbstractAbstract
[en] The conceptual design study of IFMIF has been completed at the end of 1999 by employing a reduced cost version and the staged construction scenario to achieve the final objectives to supply 500 cm3 irradiation volume with 1014 (/cm2/s) neutron flux. In the next three years, some essential technologies of key components are investigated to confirm the conceptual design. For the accelerator system, the long-term operation of high-current D+ injector, the cold model of coupled cavity cw-RFQ for 175 MHz, the heat removal from Drift Tube in cw-DTL, and some RF system components are selected as the tasks carried out by the international collaborations. (author)
Primary Subject
Source
Japan Synchrotron Radiation Research Inst., Mikazuki, Hyogo (Japan); 446 p; 2000; p. 141-143; 25. linear accelerator meeting in Japan; Himeji, Hyogo (Japan); 12-14 Jul 2000; Available from Japan Synchrotron Radiation Research Institute, 1-1-1 Koto, Mikazuki-cho, Hyogo-ken 679-5198 Japan; 7 figs., 5 refs.
Record Type
Miscellaneous
Literature Type
Conference
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue