Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
Ikeda, M.; Ohsawa, S.; Furukawa, K.; Shirakawa, A.
Proceedings of the 25th linear accelerator meeting in Japan2000
Proceedings of the 25th linear accelerator meeting in Japan2000
AbstractAbstract
[en] In order to increase positrons, the KEKB e-/e+ Linac is accelerating high-intensity electron beams of 10 nC, which require high stability of each equipment. In the efforts to stabilize the beams, we started to monitor pulse timings concerning beams such as gun-grid pulses of 1 ns pulse width and electron beam pulses of 1 ns/10 ps widths. The grid pulses are measured by means of a digital oscilloscope and the pulse timing is now being controlled within 50 ps by a feedback system. The beam pulses form a wall current monitor at buncher exit gives us bunched beam information, which is measured by a sampling oscilloscope. We are also monitoring RF phases of sub harmonic bunchers with respect to a reference RF wave of 2856 MHz. The time fluctuations of these values can be seen on Web browsers. (author)
Primary Subject
Source
Japan Synchrotron Radiation Research Inst., Mikazuki, Hyogo (Japan); 446 p; 2000; p. 264-266; 25. linear accelerator meeting in Japan; Himeji, Hyogo (Japan); 12-14 Jul 2000; Available from Japan Synchrotron Radiation Research Institute, 1-1-1 Koto, Mikazuki-cho, Hyogo-ken 679-5198 Japan; 6 figs., 1 ref.
Record Type
Miscellaneous
Literature Type
Conference
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue