Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
AbstractAbstract
[en] The Plutonium Immobilization Plant (PIP) will encapsulate plutonium in ceramic pucks and seal the pucks inside welded cans. Remote equipment will place these cans in magazines and the magazines in a Defense Waste Processing Facility (DWPF) canister. The DWPF will fill the canister with glass for permanent storage. This report discusses the Plutonium Immobilization Can Loading conceptual design for the 13 Metric Ton (MT) PIP throughput case. This report includes a process block diagram, process description, and preliminary equipment specifications and documents the changes to the original can loading concept documented in previous reports
Primary Subject
Source
31 Jan 2001; [vp.]; AC09-96SR18500; Available from https://www.osti.gov/servlets/purl/774273-KqdvoO/native/
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue