Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.036 seconds
Akemoto, M.; Honma, H.; Shidara, T.; Anami, S.
Proceedings of the 25th linear accelerator meeting in Japan2000
Proceedings of the 25th linear accelerator meeting in Japan2000
AbstractAbstract
[en] The 8 GeV Linac at the KEK has been in continuous operation for the KEKB experiment since September 1998. Total 59 units of klystron modulators are under continuous operation. The accumulated high-voltage run-time of the modulators has reached approximately 11,000 hours in March 2000. This paper describes lifetimes and failure modes of the thyratrons that are used as a modulator switch during the operation. (author)
Primary Subject
Source
Japan Synchrotron Radiation Research Inst., Mikazuki, Hyogo (Japan); 446 p; 2000; p. 213-215; 25. linear accelerator meeting in Japan; Himeji, Hyogo (Japan); 12-14 Jul 2000; Available from Japan Synchrotron Radiation Research Institute, 1-1-1 Koto, Mikazuki-cho, Hyogo-ken 679-5198 Japan; 4 refs., 3 figs., 3 tabs.
Record Type
Miscellaneous
Literature Type
Conference
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue