Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.015 seconds
AbstractAbstract
[en] Since May 1996, under its draft Civilian Radioactive Waste Management Program Plan (DOE 1996), DOE has been carrying out a 5-year program of work to support the decision in 2001 by the Secretary of Energy on whether or not to recommend the site to the President. Part of this program was to address major unresolved technical issues and to complete an assessment of the viability of the Yucca Mountain site by 1998. Affirming the DOE plans, Congress directed DOE in the 1997 Energy and Water Development Appropriations Act to provide a viability assessment of the Yucca Mountain site to Congress and the President. This Viability Assessment (VA) document is the DOE report to Congress and the President. They are expected to use the VA to make an informed decision about program direction and funding. Drawing on 15 years of scientific investigation and design work at Yucca Mountain, the VA summarizes a large technical basis of field investigations, laboratory tests, models, analyses, and engineering, described in cited references. The VA identifies the major uncertainties relevant to the technical defensibility of DOE analyses and designs, the DOE approach to managing these uncertainties, and the status of work toward the site recommendation and LA. The VA also identifies DOE plans for the remaining work, and the estimated costs of completing an LA and constructing and operating a repository. The attention to uncertainties is important because DOE must evaluate how the repository will perform during the next 10,000 years or longer. Uncertainties exist because of variability in the natural (geologic and hydrologic) systems at Yucca Mountain and because of imperfect scientific understanding of the natural processes that might affect the repository system. This is Volume 1 and it covers, Introduction and Site Characteristics, includes a high-level summary of the results of the VA and some additional background information. (The overview is bound separately.) Section 1 of Volume 1 provides introductory information about the types of waste that are destined for geologic disposal, the challenges posed by geologic disposal, a history of efforts to site a geologic repository in the US, a brief description of how DOE manages the repository program, a description of the key technical components of the repository program, and a summary of the DOE approach to identifying and prioritizing the remaining work required to complete an LA. Section 2 of Volume 1 summarizes the DOE understanding of the natural geologic and hydrologic systems of the Yucca Mountain site
Primary Subject
Secondary Subject
Source
1 Dec 1998; [vp.]; AC01-91RW00134; Available from PURL: https://www.osti.gov/servlets/purl/762972-2T28gg/native/
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue