Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.019 seconds
AbstractAbstract
[en] The previous proposal for a new HO-1 signal which was based on the coolant temperature at the reactor core outlet has not been accepted because this principle is not considered to be reliable enough. The Dukovany management required a HO-1 signal derived directly from the quantities measured. Now it proposed that a new HO-1 signal can be derived from the primary circuit pressure with a setting of 13.3 MPa. Testing analyses which were performed demonstrate that this signal would intervene rapidly enough in the majority of conceivable events. (P.A.)
Original Title
Navrh noveho signalu HO-1 zajistujiciho ochranu proti nekontrolovanemu vysouvani skupiny HRK. Revize 0
Primary Subject
Source
May 1999; [175 p.]; Availability information: Deposited with Nuclear Research Institute Rez (NRI), 250 68 Rez, Czech Republic. For availability conditions contact the NRI Library, e-mail: ret@nri.cz; 8 tabs., 414 figs., 17 refs.
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue