Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.016 seconds
Kenneth Baggett; George Biallas; Donald Bullard; Jeffery Dail; David Douglas; Tommy Hiatt; Michael Mccrea
Thomas Jefferson National Accelerator Facility, Newport News, VA (United States). Funding organisation: USDOE Office of Energy Research (ER) (United States)2003
Thomas Jefferson National Accelerator Facility, Newport News, VA (United States). Funding organisation: USDOE Office of Energy Research (ER) (United States)2003
AbstractAbstract
[en] A family of large bending dipoles has been magnetically measured to support the 10 kW IR-FEL upgrade. This upgrade will allow for a wider wavelength range and an increase in the machine energy to operate between 80 MeV/c and 210 MeV/c. The dipole magnets allow the beam to bend 180 degrees over a 1 meter radius. The requirements for these magnets include varying field strengths, large horizontal apertures and parts in 10,000 field homogeneity as well as setability of core and integrated field. This paper will describe the process involved in measuring and achieving these requirements
Primary Subject
Source
1 May 2003; 84 Kilobytes; PAC 2003; Seattle, WA (United States); 12-16 May 2003; DOE/ER--40150-2493; AC--05-84ER40150; Available from https://www.osti.gov/servlets/purl/811261-drzOiq/native/
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue