Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.014 seconds
SUNG-IL KWON; AMY H. REGAN
Los Alamos National Lab., NM (United States). Funding organisation: US Department of Energy (United States)2002
Los Alamos National Lab., NM (United States). Funding organisation: US Department of Energy (United States)2002
AbstractAbstract
[en] This paper addresses the modeling problem of the linear accelerator RF system in SNS. Klystrons are modeled as linear parameter varying systems. The effect of the high voltage power supply ripple on the klystron output voltage and the output phase is modeled as an additive disturbance. The cavity is modeled as a linear system and the beam current is modeled as the exogenous disturbance. The output uncertainty of the low level RF system which results from the uncertainties in the RF components and cabling is modeled as multiplicative uncertainty. Also, the feedback loop uncertainty and digital signal processing signal conditioning subsystem uncertainties are lumped together and are modeled as multiplicative uncertainty. Finally, the time delays in the loop are modeled as a lumped time delay. For the perturbed open loop system, the closed loop system performance, and stability are analyzed with the PI feedback controller
Primary Subject
Source
10 Apr 2002; 805 Kilobytes; W--7405-ENG-36; Available from https://www.osti.gov/servlets/purl/810037-g05OWK/native/
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue