Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.02 seconds
AbstractAbstract
[en] The biggest electric power generators in Republic of Macedonia are the power blocks at Bitola Thermal Power Plant. Therefore, the reliability of their relay protection is of exclusive importance for the total Macedonian Power System. In this paper an approximate calculation of the relay protection reliability at the REK Bitola according to the collected statistical data in the course of the monitoring period is presented
Original Title
Analiza na rabotata na relejnata zashtita vo REK Bitola vo period od 1988 do 2000 godina
Primary Subject
Source
Shukleva, Eva; Taleski, Rubin (eds.); MAKO CIGRE - Macedonian Committee on Large High Voltage Systems, Skopje (Macedonia, The Former Yugoslav Republic of); 288 p; ISBN 9989-9671-2-1;
; 2001; p. P34.01.1.1-P34.01.5.5; MAKO CIGRE 3. Consultative meeting [Macedonian Committee on Large High Voltage Systems]; Treto sovetuvanje na Makedonski komitet za golemi elektrichni sistemi CIGRE; Ohrid (Macedonia, The Former Yugoslav Republic of); 3-6 Oct 2001; Also available from the National and University Library 'Kliment Ohridski', Skopje, Macedonia; 3 refs., 3 tabs.

Record Type
Miscellaneous
Literature Type
Conference; Numerical Data
Report Number
Country of publication
LanguageLanguage
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue