Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
AbstractAbstract
[en] Construction is a very important stage in the course of realization of Nuclear Power Projects and as much care has be devoted to this stage as to the planning and engineering stages. While the setting up of nuclear power projects used to take over seven years in the past, the time period has now been considerably reduced to about five years with advancements in construction engineering, project management and design techniques, on the basis of new initiatives from the owner agency, Nuclear Power Corporation of India. In this article, the constructional aspects of the specialized structures for nuclear power generation are looked into. (author)
Primary Subject
Source
10 figs.
Record Type
Journal Article
Journal
Journal of Structural Engineering (Madras); CODEN JSENEI; v. 30(1); p. 51-56
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue