Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.025 seconds
AbstractAbstract
[en] The measure 'Improvement of the reliability of the emergency diesel generators and their protections' 28411 is part of the modernization program for Units 5 and 6 of Kozloduy NPP. The scope of the measure includes complete change of the I and C system, the local control panels, the technological and electrical protections of the DG set, the excitation system and some of the power distribution switchboards. The new I and C system will be Teleperm XS type, produced by Framatome ANP, the power distribution switchboards type Sivacon, the excitation system Thyripart, and the electrical protection and synchronization system will be provided by Siemens. The purpose of the measure is to increase the availability, maintainability and to improve the reliability of the DG sets
Original Title
Povishavane na nadezhdnostta na dizel-generatornite agregati za avarijno zakhranvane i tekhnite zashtiti kato chast ot programata za modernizatsiya na blokove 5 i 6 na AETs Kozloduy
Primary Subject
Source
2003; 7 p; BULATOM International Nuclear Forum. 'Nuclear Energy - challenges and Prospects; Varna (Bulgaria); 17-20 Jun 2003; 6 figs.
Record Type
Miscellaneous
Literature Type
Conference
Report Number
Country of publication
CONTROL SYSTEMS, ELECTRICAL EQUIPMENT, ENGINEERED SAFETY SYSTEMS, ENGINES, ENRICHED URANIUM REACTORS, EQUIPMENT, HEAT ENGINES, INTERNAL COMBUSTION ENGINES, POWER REACTORS, PWR TYPE REACTORS, REACTOR COMPONENTS, REACTORS, THERMAL REACTORS, WATER COOLED REACTORS, WATER MODERATED REACTORS, WWER TYPE REACTORS
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue