Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
Seo, Jeong Moon; Choi, In Kil
Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)2001
Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)2001
AbstractAbstract
[en] The ISI (In-Service Inspection) of a PCCV (Prestressed Concrete Containment Vessel) consists of the tendon ISI and the SIT (Structural Integrity Test) which evaluate the effective or residual prestress in the post-tensioned prestress system, and of the ILRT (Integrated Leakage Rate Test) which ensures the leak-tightness of a PCCV. The tendon system adopted in Korean PCCVs is either grouted or ungrouted one. The grouted tendon system was used in the Ulchin Unit 1 and 2 and the Wolsong Units 1-4, whereas the rest NPPs except Kori Unit 1 and 2 adopted an ungrouted tendon system. In this report, the issues were identified on the ISI of ungrouted tendon system and on the SIT of all the PCCVs. The ILRT issues are implicitly included in the SIT issues as the ILRT is performed in parallel with the SIT. Improvements were suggested on the issues identified after the analyses of the domestic and foreign experiences and researches
Primary Subject
Source
Dec 2001; 80 p; 17 refs, 33 figs
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue