Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
AbstractAbstract
[en] The BEPC will increase its luminosity ten times with upgrade of both the machine and detector, which is the project BEPCII. The project will be started at beginning of 2002 and finished within 3-4 years. In order to reach the goal of the BEPCII, a number of new equipment will be added in the system, such as the superconducting RF cavities, new magnet power supplies and beam feedback system, and the BEPC control system has to be upgraded. The BEPC control system was built in 1987 and was upgraded in 1994. It is an Open VMS and CAMAC based-system, some equipment is controlled by PCs. The authors are going to upgrade the existing system by EPICS. Several VME IOCs will be added in the system with fieldbus, PLCs for the new equipment control. And the authors will keep the existing system in use, such as CAMAC hardware, PC based sub-control and application programs, which will be merged into the EPICS system. Recently the development of the EPICS prototype has been started. Regard some slow control, commercial SCADA product can be chosen as the development tool. The authors have just finished a prototype with the SCADA product Wizcon. The authors will describe the system design and development issues
Primary Subject
Secondary Subject
Source
Chen, H.S. (ed.) (Chinese Academy of Sciences, Beijing (China). Inst. of High Energy Physics); 757 p; 2001; p. 117-120; CHEP 2001: international conference on computing in high energy and nuclear physics; Beijing (China); 3-7 Sep 2001; Available from China Nuclear Information Centre
Record Type
Miscellaneous
Literature Type
Conference
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue