Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.014 seconds
AbstractAbstract
[en] In this leaflet results of exploitation of four units of the Bohunice V-1 and V-2 NPPs are presented. The electricity and heat production in April 2003 are reviewed. Within April 2003 the electricity was produced: 115 GWh (block 1), 298 GWh (block 2), 288 GWh (block 3), 243 GWh (block 4), totally 944 GWh, and 4192 GWh within January - April 2003. The heat production in April 2003 was 116 615 GJ, and within January - April 2003 it was produced 863 443 GJ of heat. Indicators of Bohunice NPP blocks according to methodology of WANO are reviewed
Original Title
Bohunice - informacie za april 2003
Primary Subject
Secondary Subject
Source
2003; 2 p; Atomove elektrarne Bohunice; Jaslovske Bohunice (Slovakia); Also available: English translation can be ordered from the Omega Info, Vysehradska 33, 85106 Bratislava, Slovak Republic (e-mail: info at omegainfo.sk), at USD 10.00 per standard page (1800 characters); 1 fig., 1 tab.
Record Type
Miscellaneous
Literature Type
Numerical Data
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue