Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.016 seconds
AbstractAbstract
[en] In this leaflet results of exploitation of four units of the Bohunice V-1 and V-2 NPPs are presented. The electricity and heat production in August 20003 are reviewed. Within a August 2003 the electricity was produced: 287 GWh (block 1), 199 GWh (block 2), 0 GWh (block 3), 301 GWh (block 4), totally 787 GWh, and 7657 GWh within a January - August 2003. The heat production in August 2003 was 28 316 GJ, and within a January - August 2003 it was produced 984 881 GJ of heat. In the last August week the post conference of the SMIRT (Structural Mechanics in Reactor Technology) took place in the Bohunice NPP. The eight seminar was aimed on the fire protection on nuclear power plants and equipment. Experts expressed favourably about nuclear safety improvement on the Bohunice NPP . Professor Ulrich Schneider said 'that is incredible what we reached during 12 years'
Original Title
Bohunice - informacie za august 2003
Primary Subject
Secondary Subject
Source
2003; 2 p; Atomove elektrarne Bohunice; Jaslovske Bohunice (Slovakia); Also available: English translation can be ordered from the Omega Info, Vysehradska 33, 85106 Bratislava, Slovak Republic (e-mail: info at omegainfo.sk), at USD 10.00 per standard page (1800 characters); 1 fig., 1 tab.
Record Type
Miscellaneous
Literature Type
Numerical Data
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue