Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.02 seconds
AbstractAbstract
[en] In response to a renewed interest in building nuclear power plants, the NRC has created organizations within its major program offices to prepare the NRC staff for new applications (early site permits [ESPs], design certifications, and combined licenses) and to manage special task groups and pro-application reviews of new reactor designs. Activities planned in FY2001 and FY2002 include: (1) evaluating the ability of the NRC staff to support future application reviews under 10 CFR Parts 50 and 52; (2) performing pre-application reviews of the API 000 (a light-water reactor design with passive safety systems), Pebble Bed Modular Reactor (PBMR - a high-temperature gas-cooled reactor design), ESPs, IRIS (an advanced light-water reactor design), and GT-MHR (a high-temperature gas-cooled reactor design); (3) initiating and/or performing related rulemakings that will update 10 CPR Part 52 to reflect lessons learned from certifying three nuclear plant designs, update Tables S-3 and S-4 of 10 CFR Part 51 to address higher burnup fuel considerations and non-LWR advanced designs, and address alternative siting considerations; (4) reactivating the construction inspection program; and, (5) interacting with stakeholders to ensure there is a clear understanding of upcoming activities related to future applications and to solicit stakeholder input. In FY2002 and FY200S, activities are expected to include: (1) managing the reviews of fine new applications resulting from the pre-application reviews (including one design certification, one combined license, and three ESP reviews); (2) managing two pre-application reviews (IRIS and QT-MHR); (3) updating regulatory and review guidance for new applications, i.e., Standard Review Plans (SRPs), Regulatory Guides, and referenced codes and standards, and identifying where enhancements are needed; (4) developing independent codes to analyze the safety of non-LWR designs, with supporting validation testing; and, (5) addressing regulatory infrastructure issues, including NEI's proposed New Plant Regulatory Framework initiative, and NRC regulations governing financial issues and operator staffing
Primary Subject
Source
U.S. Nuclear Regulatory Commission, Advisory Committee on Reactor Safeguards, Washington, DC (United States); 340 p; Dec 2001; p. 165-170; Advisory committee on reactor safeguards workshop on future reactors; Rockville, MD (United States); 4-5 Jun 2001
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue