Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.021 seconds
Giubergia, J.H.; Coppari, N.R.; Rey, F.C., E-mail: giuberg@cnea.gov.ar
Instituto Nacional de Investigaciones Nucleares, Ocoyoacac, Estado de Mexico (Mexico); Comision Nacional de Seguridad Nuclear y Salvaguardias, Mexico D.F. (Mexico); Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Comision Federal de Electricidad, Gerencia de Centrales Nucleoelectricas, Mexico D.F. (Mexico)2004
Instituto Nacional de Investigaciones Nucleares, Ocoyoacac, Estado de Mexico (Mexico); Comision Nacional de Seguridad Nuclear y Salvaguardias, Mexico D.F. (Mexico); Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Comision Federal de Electricidad, Gerencia de Centrales Nucleoelectricas, Mexico D.F. (Mexico)2004
AbstractAbstract
[en] In this work one simulates, using the program MESSAGE, the generation park electric of the Argentine Republic and their possible expansion, with restrictions in the readiness of fossil fuels. This, as other models of planning energetics promoted by IAEA, optimizes the expansion of the net having as function objective the smallest cost in the system. 25 years they were simulated, adopting like base the anus 2000 and considering different scenarios of internal and external demands. It was analysed the increase of the demand with restrictions in the readiness of the natural gas in the winter periods, since the Argentinean electric system has a great dependence of this fuel. To cover the increase of the electric demand, were selected the machines and fuels, at the moment available, with more technical and economic possibilities. In the scenarios without restrictions to the use of natural gas the program selects to the nuclear power station of Atucha II, to the increase of bench mark of the hydraulic power station of Yacireta and combined cycles that burn natural gas. In those in that the supply of natural gas is limited, it selects previously besides the signal ones, other nuclear power stations, other hydroelectric projects and turbines of gas operating with gas oil to cover the top requirements. (Author)
Original Title
Simulacion del parque de generacion electrica de la Republica Argentina, analisis de su posible expansion con restricciones en la disponibilidad de los combustibles fosiles
Primary Subject
Source
2004; 15 p; 15. Annual Congress of the SNM; Cancun (Mexico); 11-14 Jul 2004; 22. Annual Meeting of the SMSR; Cancun (Mexico); 11-14 Jul 2004; International Joint Meeting Cancun 2004; Cancun (Mexico); 11-14 Jul 2004; International Conjunct Congress Cancun 2004; Cancun (Mexico); 11-14 Jul 2004; 2004 LAS/ANS Symposium; Cancun (Mexico); 11-14 Jul 2004
Record Type
Miscellaneous
Literature Type
Conference
Report Number
Country of publication
COMPUTER CODES, DEMAND, DEVELOPING COUNTRIES, ENERGY SOURCES, EVALUATION, FLUIDS, FOSSIL FUELS, FUEL GAS, FUELS, GAS FUELS, GASES, HEAVY WATER COOLED REACTORS, HEAVY WATER MODERATED REACTORS, INFORMATION, LATIN AMERICA, NATURAL URANIUM REACTORS, PHWR TYPE REACTORS, POWER, POWER REACTORS, PRESSURE TUBE REACTORS, REACTORS, RESOURCES, SOUTH AMERICA, THERMAL REACTORS
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue