Pajtinka, A.; Tvaroska, V.; Wiening, K.-H.; Mueller, B.
Proceedings of the 9th NUSIM 2000 Conference. Joint Slovak, Czech and German Seminar on Nuclear Power2000
Proceedings of the 9th NUSIM 2000 Conference. Joint Slovak, Czech and German Seminar on Nuclear Power2000
AbstractAbstract
[en] The last and the most extensive stage in the reconstruction project of the Bohunice NPP started in July 1998. The main activities performed during a 6-month scheduled unit 2 outage included: - Installation of a new emergency core cooling system with an increased capacity according to the defined broader break spectrum for LOCA; - Reconstruction of the existing confinement spray system and installation of a new confinement pressure suppression system; - Completion of upgrading measures to increase the reliability of emergency power supply systems (replacement of low voltage switchgear, installation of new cabling for all loads important to safety, installation of new motor-generators and rectifier sets); - Connection to the plant and commissioning of the new reactor protection system. Comprehensive tests and checks performed on completion of installation work on the modified mechanical, electrical and I and C systems were important reasons for the absence of major problems during restart of the unit after the several project implementation phases. Operating experience at unit 2 since its recommissioning in January 1999 has confirmed that the required safety standards have been met and that operational reliability has been substantially increased at the sometime. Periodic testing is being performed in accordance with the limits and conditions for safe operation of Bohunice NPP. To date all these tests were completed without significant problems. The functions implemented in the new technology met the test program criteria, which were approved with authority, in all essential areas. Through the close cooperation of the partners involved and through the combined efforts of the various engineering and operating disciplines, technical and scheduling problems could be immediately identified and quickly resolved. In general, these kinds of projects require optimum cooperation among the parties involved. Modernization of the NPP Bohunice V1 unit 2 has shown, that all challenges were met successfully under these conditions. (authors)
Primary Subject
Source
Slovak Nuclear Society, Trnava (Slovakia); Kerntechnische Gesellschaft e.V. (KTG), 10115 Berlin (Germany); Czech Nuclear Society, Prague (Czech Republic); 354 p; 2000; [4 p.]; NUSIM 2000; Casta-Papiernicka (Slovakia); 15-17 Mar 2000; Presented by Miroslav Mlcuch (Slovenske elektrarne, a.s., Bohunice Nuclear Power Plant, Jaslovske Bohunice)
Record Type
Miscellaneous
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue