Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
HOPKINS, A.M.; KLOS, D.B.
Hanford Site, Richland, WA (United States). Funding organisation: USDOE - Office of Environmental Management EM (United States)2007
Hanford Site, Richland, WA (United States). Funding organisation: USDOE - Office of Environmental Management EM (United States)2007
AbstractAbstract
[en] In 2002, the Richland Operations Office (RL) of the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) developed milestones for transitioning the Plutonium Finishing Plant (PFP) facility to a clean slab-on-grade configuration. These milestones required developing an engineering evaluation/cost analysis (EF/CA) for the facility's sub-grade structures and installations as part of a series of evaluations intended to provide for the transition of the facility to a clean slab-on-grade configuration. In addition to supporting decisions for interim actions, the analyses of sub-grade structures and installations performed through this EE/CA will contribute to the remedial investigation feasibility study(ies) and subsequently to the final records of decision for the relevant operable units responsible for site closure in the 200 West Area of the Hanford Site
Primary Subject
Source
25 Jan 2007; 17 p; 33. Annual Waste Management Conference and Exhibition (WM07); Tucson, AZ (United States); 25 Feb - 1 Mar 2007; AC06-96RL13200; Also available from OSTI as DE00899764; PURL: https://www.osti.gov/servlets/purl/899764-vF4nuv/
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue