Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.016 seconds
AbstractAbstract
[en] The purpose of this analysis is to outline and recommend two standby generator systems. These systems shall provide power during a utility outage to critical Alcove No.5's thermal test loads and to subsurface flow through ventilation loads. Critical loads that will be supported by these generator systems will be identified and evaluated. Additionally, other requirements from the Exploratory Studies Facilities Design Requirements (ESFDR) document will be evaluated. Finally, the standby generator systems will be integrated into the existing ESF subsurface distribution system. The objective of this analysis is to provide design inputs for an efficient and reliable standby generator systems which will provide power for critical loads during a power outage; specifically, Alcove No.5's thermal test loads and the subsurface flow through ventilation loads. Additionally, preliminary one-line diagrams will be developed using this analysis as a primary input
Primary Subject
Source
17 Apr 1998; 34 p; MOL.19981111.0002, DC 22934; Also available from OSTI as DE00895070; PURL: https://www.osti.gov/servlets/purl/895070-l2Imbv/; doi 10.2172/895070
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue