Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
AbstractAbstract
[en] A new design feature of DVI+, to mitigate an ECC bypass fraction and to prevent switching an ECC inlet to a break outlet during a DVI line break, is presented for an advanced DVI system. The injected ECC water into the downcomer is easily shifted to the broken cold leg by a high steam cross flow which is coming from the intact cold legs during the late reflood phase of a LBLOCA with a smooth annulus of the downcomer in the current DVI system. The performance of the ECC penetration duct is evaluated by LOCA PCT behaviors for a LOCA and an ECC penetration flow shape for a nominal working condition. The MARS code and CFX code are applied for this evaluation
Primary Subject
Source
Korean Nuclear Society, Daejeon (Korea, Republic of); [1 CD-ROM]; May 2008; [2 p.]; 2008 spring meeting of the KNS; Kyeongju (Korea, Republic of); 29-30 May 2008; Available from KNS, Daejeon (KR); 3 refs, 4 figs
Record Type
Miscellaneous
Literature Type
Conference
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue