Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
AbstractAbstract
[en] In terms of training for commissioning this appendix is an example of: - Expansion of existing NPP fleet. Mochovce Units 1 and 2 were of the same VVER-440/213 type as the Bohunice Units 3 and 4, which have been operated since 1983-1985. It was an advantage for the Mochovce NPP because many of experienced and trained people from the Bohunice NPP could be recruited for key functions and for other positions at the Mochovce NPP. Another advantage was that new inexperienced Mochovce employees could be trained at the Bohunice NPP during the Mochovce NPP construction. - Significant design change during NPP construction. The original project of the Mochovce NPP was changed during construction. In 1991, the management of the Mochovce NPP decided that the original Process Control System would be replaced by the new one from Siemens AG. After this Project change, the new Control Room Simulator, new training programmes and new training materials had to be developed for training of personnel for commissioning of the Mochovce NPP. All the Mochovce personnel, that had been trained by Bohunice programmes in 1982-1993, had to be additionally retrained by Mochovce training programmes. - Project of delayed NPP construction. The construction of the Mochovce NPP was delayed for several years. The Mochovce NPP construction started in November 1982 and it generally met its schedule until 1989. After the political changes in Czechoslovakia in 1989 (the velvet revolution), some problems around the Mochovce NPP construction occurred (additional safety questions, environmental aspects and financial problems, mainly). In 1993, these problems caused a complete stoppage of Mochovce NPP construction. The construction continued again in 1996 and it was successfully completed at Unit 1 in 1998 and at Unit 2 in 2000. In terms of personnel training for Mochovce commissioning, the project delay had a positive impact, because there was extra time for education and training of personnel for commissioning of the Mochovce NPP
Primary Subject
Source
International Atomic Energy Agency, Nuclear Power Engineering Section, Vienna (Austria); 103 p; ISBN 978-92-0-103608-7;
; Apr 2008; p. 59-66; ISSN 1995-7807;
; Also available on-line: http://www-pub.iaea.org/MTCD/publications/PDF/P_1334_web.pdf; For availability on CD-ROM, please contact IAEA, Sales and Promotion Unit: E-mail: sales.publications@iaea.org; Web site: http://www-pub.iaea.org/MTCD/publications.asp; 1 fig., 3 tabs; This record replaces 39066452


Record Type
Book
Country of publication
ANALOG SYSTEMS, COMMISSIONING, DEVELOPING COUNTRIES, EASTERN EUROPE, EDUCATION, ENRICHED URANIUM REACTORS, EUROPE, FUNCTIONAL MODELS, NUCLEAR FACILITIES, POWER PLANTS, POWER REACTORS, PWR TYPE REACTORS, REACTORS, SAFETY, THERMAL POWER PLANTS, THERMAL REACTORS, WATER COOLED REACTORS, WATER MODERATED REACTORS, WWER TYPE REACTORS
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue