Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.019 seconds
Takemoto, Noriyuki; Izumo, Hironobu; Inoue, Shuichi; Baba, Osamu; Nagao, Yoshiharu; Abe, Shinichi; Naka, Michihiro; Akashi, Kazutomo; Ohmi, Masao; Miyazawa, Masataka
Japan Atomic Energy Agency, Tokai, Ibaraki (Japan)2008
Japan Atomic Energy Agency, Tokai, Ibaraki (Japan)2008
AbstractAbstract
[en] The JMTR has been being refurbished since FY2007 to restart from FY2011. The restarted JMTR is expected to contribute (1) life time extension of light water reactors, (2) research on science and technology, (3) expansion of industrial use, (4) education of nuclear experts, etc. After restart, safe and stable operation with high availability-factor is required to supply the demand concerning above utilization. Therefore, we propose the reactor operation procedure and so on possible to realize 210 days stable operation per year (availability-factor at about 60%) by the investigation on crucial subjects to achieve world-highest-level of availability-factor as materials testing reactors. (author)
Primary Subject
Source
Oct 2008; 42 p; Also available from JAEA; URL: http://dx.doi.org/10.11484/JAEA-Review-2008-051; 21 refs., 18 figs., 1 tab.
Record Type
Report
Report Number
Country of publication
ENERGY CONSUMPTION, ENRICHED URANIUM REACTORS, INDUSTRY, IRRADIATION REACTORS, LIFETIME, MATERIALS TESTING REACTORS, OPERATION, REACTORS, RESEARCH AND TEST REACTORS, RESEARCH REACTORS, SERVICE LIFE, TANK TYPE REACTORS, TEST FACILITIES, TEST REACTORS, VARIATIONS, WATER COOLED REACTORS, WATER MODERATED REACTORS
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue