Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
AbstractAbstract
[en] During the last two years the reactor was in operation without any longer shut-down. Only a small bending of the regulating control rod was noticed. This failure was repaired. One of the major problem, but not connected to the operation of the reactor, is the delivery of the new FLIP fuel elements. Since the beginning of operation, the reactor has been at full power about 24-00 hours per year, or 220 hours per month, which means that the utilization of the reactor in Ljubljana is relatively very high. One of the reasons for this high utilization is the quite extensive production of radioactive isotopes, especially short lived, for various consumers and the irradiation of samples for our nuclear chemistry division. Problems with rotary specimen rack occurred and a new rotary specimen rack was installed. During the last years some of the original instrumentation of the reactor was substituted because of ageing of the electronics or to improve the operational capabilities of the reactor
Primary Subject
Source
General Atomic, San Diego, CA (United States); J. Stefan Institute, University of Ljubljana, Ljubljana (Yugoslavia); 340 p; 1978; p. 2.6-2.10; 5. European conference of TRIGA users; Portoroz (Yugoslavia); 4-6 Sep 1978; Country of input: International Atomic Energy Agency (IAEA); 1 fig; This record replaces 40032951
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
CHEMISTRY, ENRICHED URANIUM REACTORS, HOMOGENEOUS REACTORS, HYDRIDE MODERATED REACTORS, IRRADIATION REACTORS, ISOTOPE PRODUCTION REACTORS, MAINTENANCE, OPERATION, REACTOR COMPONENTS, REACTORS, RESEARCH AND TEST REACTORS, SOLID HOMOGENEOUS REACTORS, THERMAL REACTORS, TRIGA TYPE REACTORS, WATER COOLED REACTORS, WATER MODERATED REACTORS
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue