Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.014 seconds
AbstractAbstract
[en] The follow-up of the commissioning of the CENM-TRIGA Mark II Reactor has been performed in conformance with national regulation and the IAEA standards. For this purpose, the CNESTEN established a safety committee to review all safety aspects during reactor commissioning and operation. A set of hold points was established in the commissioning program, typically at the end of each stage to ensure that (i) test results have been reviewed by the safety committee and meet acceptance criterion, and (ii) requirements for the performance of the following stage of the commissioning program reviewed and understood by all the parties
Primary Subject
Source
European Nuclear Society, Brussels (Belgium); National Center for Energy, Science and Nuclear Techniques, Rabat (Morocco); International Atomic Energy Agency, Division of Nuclear Fuel Cycle and Waste Technology, Research Reactor Group, Vienna (Austria); 522 p; ISBN 978-92-95064-10-2;
; 2010; [2 p.]; RRFM 2010: 14. international topical meeting on Research Reactor Fuel Management (RRFM); Marrakech (Morocco); 21-25 Mar 2010; Also available on-line: http://www.euronuclear.org/meetings/rrfm2010/transactions/RRFM2010-transactions.pdf; Country of input: International Atomic Energy Agency (IAEA)

Record Type
Report
Literature Type
Conference
Report Number
Country of publication
COMMISSIONING, DOCUMENT TYPES, ENRICHED URANIUM REACTORS, HOMOGENEOUS REACTORS, HYDRIDE MODERATED REACTORS, INTERNATIONAL ORGANIZATIONS, IRRADIATION REACTORS, ISOTOPE PRODUCTION REACTORS, LAWS, OPERATION, REACTORS, RESEARCH AND TEST REACTORS, SOLID HOMOGENEOUS REACTORS, THERMAL REACTORS, TRIGA TYPE REACTORS, WATER COOLED REACTORS, WATER MODERATED REACTORS
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue