Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.015 seconds
AbstractAbstract
[en] This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing 'Short' 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing 'Tall' 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing SWB Payload Assembly; and 1.7, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed.
Primary Subject
Source
28 Feb 2005; 108 p; AC29-01AL66444; Also available from U.S. DOE Carlsbad Field Office, Waste Isolation Pilot Plant, Carlsbad, New Mexico; WIPP Information Center - 1-800-336-9477; OSTI as DE00876682; PURL: https://www.osti.gov/servlets/purl/876682-R1F6RR/; doi 10.2172/876682
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue