Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.025 seconds
AbstractAbstract
[en] Japan, which is host country for the Ninth Regular Session of the Agency General Conference, has an important programme of nuclear power development to meet future needs. In addition, Japan is active in other applications of atomic energy and is building up a domestic nuclear engineering industry. Japan has profited by the Agency as a channel of international cooperation, and was a party to the first bilateral agreement in which the responsibility for administering safeguards against the diversion of materials to military purposes, was transferred to the Agency. Japan has also lent support to Agency programmes by gifts, training courses, research, and the loan of experts. In 1961, the Japan Atomic Energy Commission (AEC) formulated the 'Long-Range Programme for Development and Utilization of Atomic Energy', on the basis of the economic prospects of nuclear power generation, and the conditions necessary to meet the ever-increasing domestic energy demands. According to this programme, in the light of power reactor development trends overseas, it is expected that nuclear power costs will compete with those of oil burning stations by 1970. On this basis, total nuclear power generating capacity of 1000 MW(e) will be attained by 1970, and 7000 - 9 500M(e) by 1980. As a prelude to the above programme the Japan Atomic Power Company (JAPCO) began construction in 1959 of a graphite-moderated gas-cooled nuclear power station (Improved Calder Hall type) of 165 MW(e) gross capacity. This is now progressing smoothly, and reached criticality in May 1965; it is expected to supply commercial power by the end of this year. The second nuclear power station will be built by the same company on the coast of the Japan Sea, with a light water-moderated reactor of 250 - 300 MW(e) capacity. The construction plan i s currently being pushed forward for completion in 1970. Thereafter three private utility companies - Tokyo, Kansai and Chubu Electric Companies - are doing preparatory work for the construction of three nuclear power stations each of about 300 MW(e), for completion about 1970. If these plans are carried out to schedule, the goal of 1000 MW(e) of nuclear capacity, set in the Long-Range Programme, will be exceeded
Primary Subject
Secondary Subject
Source
Available on-line: http://www.iaea.org/Archives/templates/jsp/pages/pi/BulletinWeb_Archive.jsp; 3 photos
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue