Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
AbstractAbstract
[en] The quality assurance procedure during assembling of nuclear power plants as practiced in the Federal Republic of Germany is described. According to the German law (Atomgesetz) and the postulations of the licensing authorities, a large scope of quality control methods is carried out. Responsible for fulfilling the requirements are component-manufacturers as well as system-constructor and authorized inspectors (TUV)
Primary Subject
Source
Organisation for Economic Co-Operation and Development - Nuclear Energy Agency, Committee on the safety of nuclear installations - OECD/NEA/CSNI, Le Seine Saint-Germain, 12 boulevard des Iles, F-92130 Issy-les-Moulineaux (France); 566 p; 1977; p. 258-264; Specialists' meeting on regulatory inspection practices in nuclear power plants; Madrid (Spain); 27-29 Sep 1977
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue