Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
AbstractAbstract
[en] This presentation begins with brief general information about Kozloduy Nuclear Power Plant and organization activities about fresh fuel delivery assurance. The TVSA implementation, fuel cycle, fresh fuel standard entrance inspection and additional fresh fuel inspection are briefly described. Activities concerning core refueling, radiochemistry analysis, control rods drop time, measurement of the distance between the reactor flange and PTU flange, specific items for core unloading and a comparison between the two variants for operations scope with full and without full core unloading are presented. The core unloading - results and next steps, final core design (Unit 6, 2010), preparing for core loading (Unit 6, 2010) , core loading (Unit 6, 2010), after loading core inspection (Unit 6, 2010), core inspection, reactor assembling (Unit 6, 2010), fuel control during reactor startup, fuel control during operation period and fuel assembly data base are also discussed
Primary Subject
Source
2011; 6 p; 9. International conference on WWER fuel performance, modelling and experimental support; Helena Resort (Bulgaria); 17-24 Sep 2011; 6 figs., 1 tab.
Record Type
Miscellaneous
Literature Type
Conference
Report Number
Country of publication
CHEMISTRY, CONTROL ELEMENTS, ENERGY SOURCES, ENRICHED URANIUM REACTORS, FUELS, MATERIALS, NUCLEAR FACILITIES, POWER PLANTS, POWER REACTORS, PWR TYPE REACTORS, REACTOR COMPONENTS, REACTOR MATERIALS, REACTORS, THERMAL POWER PLANTS, THERMAL REACTORS, WATER COOLED REACTORS, WATER MODERATED REACTORS, WWER TYPE REACTORS
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue