Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.019 seconds
AbstractAbstract
[en] Posiva Oy contracted (order 9681-09) Suomen Malmi Oy (Smoy) to core drill the drillholes for grouting work of the personnel shaft ONK-KU1 in ONKALO. The work took place in several phases between 29th of September 2009 and 6th of July 2010. The identification numbers of the drillholes are ONK-PP210...ONK-PP222 and ONK-PP228... ONK-PP239. The drilling rig used was hydraulic Sandvik DE 130. Extra stabilized NQ2 drilling equipment was used to ensure maximum straightness of the drillholes. The drillhole diameter with the equipment used is 75.5 mm and sample diameter is 50.5 mm. The drilling water was taken from the ONKALO drilling water pipeline and premixed sodium fluorescein was used as a label agent in the drilling water. The deviations of the drillholes were surveyed with EMS-Reflex device during drilling and when the drillhole was finished. Water loss measurements were conducted in the drillholes to estimate the need for grouting and to measure if the grouting operation was successful. (orig.)
Original Title
Injektointi- ja kontrollireikien kairaus ja vesimenekkimittaus ONKALOn henkiloekuilulla 2009-2010
Primary Subject
Secondary Subject
Source
Dec 2010; 100 p; Also available in fulltext at http://www.posiva.fi or as a soft back edition from; This record replaces 42107879
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
External URLExternal URL