Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.011 seconds
AbstractAbstract
[en] The paper presents the results from the investigation about the scheme of connecting the two new 1000 MW units of the Belene NPP and the choice of scheme for own needs. A new connecting grid is envisioned for the northern part of the country and reinforcing of the connections in the southern part. The paper presents the results from the investigation about the scheme of connecting the two new 1000 MW units of the Belene NPP and the choice of scheme for own needs. A new connecting grid is envisioned for the northern part of the country and reinforcing of the connections in the southern part. The scheme for connection to the grid 110 kV is in compliance with the requirements of Atomelektroproekt. The equivalent grid impedance should be less than 10 Ohm. The equivalent impedance of the buss 100kV is calculated for the 6 chosen connections. The assessed investments are 500 bill. leva
Original Title
ПРИСЪЕДИНЯВАНЕ НА АЕЦ “БЕЛЕНЕ” КЪМ ЕЛЕКТРОПРЕНОСНАТА МРЕЖА
Primary Subject
Secondary Subject
Source
2008; 14 p; BULATOM International Nuclear Forum: 'Nuclear Energy - challenges and Prospects'; Varna (Bulgaria); 28-30 May 2008; ppt
Record Type
Miscellaneous
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue