Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.015 seconds
AbstractAbstract
[en] The J-PARC 3-GeV Rapid Cycling Synchrotron initiates the final stage of beam commissioning aiming for the design output beam power of 1 MW from Oct. 2014 after completing the injector linac upgrade. In this paper, emittance growth and beam loss issues for the coming 1-MW beam operation will be discussed together with their possible mitigation scenarios, based on numerical simulations. (author)
Primary Subject
Source
Physical Society of Japan, Tokyo (Japan); 1360 p; ISBN 978-4-89027-112-2;
; Sep 2015; p. 012013.1-012013.6; 2. international symposium on science at J-PARC; Tsukuba, Ibaraki (Japan); 12-15 Jul 2014; Available from http://dx.doi.org/10.7566/JPSCP.8.012013; 11 refs., 8 figs.

Record Type
Book
Literature Type
Conference
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue
External URLExternal URL